Case Study - Bringing visibility to thousands of secondary substations

See how measured-data collection and infrastructure monitoring were automated across a large secondary substation network using IEC 60870-5-104 and DLMS.

Client
Substation Data Collection and Analysis
Year
Service
Software development, Security, audits & compliance, Team augmentation
FamilyFund product hero

A large energy distributor (DSO) needed better control over data collection from more than 20 000 secondary substations.

The solution combined registries, collection modules, communication classification, and remote device management into one operational foundation.

  • Java
  • Elasticsearch
  • Apache Kafka
  • Terraform
  • Ansible
  • RedHat Linux
Connected devices
20k+
People involved
6
MDs delivered
3,2k+
Infrastructure support
24/7/365

Overview

Managing measured data from a large distribution network is mostly a reliability problem. If communication is unclear, validation is manual, or device state is hidden, the whole operation slows down.

The project focused on automating data collection and validation across more than 20,000 secondary substations. It worked with IEC 60870-5-104 and DLMS communication and treated availability monitoring as a core part of the system, not an afterthought.

The final architecture brought together substation and device inventory, collection modules, communication classification, and remote management of device firmware and parameters. Each part made the distribution network easier to observe and easier to operate.

The result was a better control surface for infrastructure that already existed. Operators (DSO) gained earlier issue detection, clearer device status, and a more stable base for day-to-day data collection.

More case studies

Building a spatial content hub for a financial brand

See how 360-degree video, XR games, and virtual simulations became one Apple Vision Pro content hub for a financial brand experience.

Read more

Making substation device installation less fragile

See how field teams gained a clearer way to manage IoT device unit preparation, configuration, testing, and deployment in secondary substations.

Read more
Nikola Zitkova, COO

Nikola Zitkova / COO

Tell us about your project

Let’s turn the first call into a clear build plan.

Most good projects do not begin with a perfect brief. They begin with a product that needs to move, a system that needs work, or a technical problem that needs ownership. We will come back with a practical next step.

  • We respond with practical next steps, not a generic sales script.
  • We map product goals, technical constraints, and budget expectations.
  • We turn the first conversation into a concrete project direction.

Our offices

  • Ostrava (HQ)
    Masarykovo náměstí 15,
    702 00 Ostrava,
    Czech Republic
  • Prague
    Na Perštýně 342/1,
    110 00 Prague,
    Czech Republic
  • Warsaw
    Domaniewska Street 44,
    02-672 Warsaw,
    Poland
  • London
    Camden Street 140-146,
    NW1 9PF London,
    United Kingdom